Tom Silva builds the gable-end wall. The master electrician sets up temporary power. Richard Trethewey shows Kevin the new lines to the old radiators. Tom walks Kevin through the roof framing.
| Hosted by | Quality | Submitted by |
|---|---|---|
| VidSrc | WatchSeries | 4 years |